Hallawell
Cr Wodonga This
project was to add on a deck area and to enlarge the 2 front bedrooms
with renovation works to both bathroom and ensuite. Duragal steel
was used for the sub floor and tied into the existing house. To reduce
the weight load on the floor we used a foam cladding system which
was rendered. The decking used was a 90mm Merbau fixed to the steel
with stainless steel screws. The stairs in the middle of the deck
make a marvellous feature they where individually welded and large
slabs of Merbau laid over them.